|
1.
We excavate, as needed, to a 7" depth, compact the soil and
grade 1/8" to 1/4"/foot.
2.
A geotextile fabric barrier is applied to keep soil from
infiltrating up into the gravel base.
3.
5" of compactable gravel is leveled, graded and compressed
to a 4" depth
4.
1" of coarse sand is spread and leveled over the gravel
base.
5.
Pavers are laid in the chosen pattern with cuts being made
as needed.
6.
A ridgid edge restraint is spiked along the edge to keep the
patio in place.
7.
Pavers are compacted slightly into the sand. The joints are
filled to lock them in place.
|